GEOL 330 Final, Spring 2000

American University of Beirut · Selected Topics in Advanced Geology · 4 pages

All GEOL 330 files
GEOL 330 Final, Spring 2000, page 1

Stuck on a question? A tutor can walk you through it.

GEOL 330 Final, Spring 2000, page 2 GEOL 330 Final, Spring 2000, page 3 GEOL 330 Final, Spring 2000, page 4

More GEOL 330 files

Show the text of this final exam
American Universily of Beirut Department of Geology Geol 330Q Field & Lab Methods in Hydrogeology Final Exam NAME: : spring 2000 (20 points) — 1. Some of the project presentations made in class mentioned the following hydrogeological concepts and facts: alkalinity, seawaler intrusion, and groundwater conditions in the Greater Beirut Area. (5 points) A. What is alkalinity? (5 points) B. Name the (vo major aquifers in the Greater Beirut Area. (5 points) c. Give average values for the density and EDS of seawater. (5 points) D. What chemical element is commonly used as an indicator of seawater intrusion into fresh ground water? (20 points) 2. A well is pumped for I hours al a rate of 0.06 m/min, The diameter of the well = 20 cm, static water level before the start of pumping = 1820 m amsl, and the pumping water level al the end of the pumping period = £680 m amsl. Find : (15 points) A. the volume of groundwater pumped from the aquifer. (5 points) B. the discharge rale of groundwater pumped from the aquifer. (20 points) 3. Below are listed chemical analyses of groundwater obtained from 5 wells in an aquifer, Comment on the suitability of groundwater of each well for drinking. Well No. | — JPDS (me/D pu Ch ang) 462 460 5.6 6 122A 2414 6.3 5 290 389 7.2 8 201 not measured 3.7 12 214 424 5.9 5 (10 points) 4. A confined aquifer is heavily pumped and the average annual rate of drawdown in the aquifer is 5.5 meters. The elevation of the potentiometric surface of the aquifer is 470 meters above the top of the aquifer (top of the aquifer is the bottom of the confining layer). Calculate the length of time required for the aquifer to be converted to an unconfined aquifer. (10 points) 5. Use the diagram below to write a conceptual groundwater budget (groundwater balance) for Aquifer 1. Note that groundwater is pumped from several wells in Towns A and B to meet the increasing municipal and agricultural demands. Furthermore, artificial groundwater recharge is practiced in Town A using large recharge basins. Precififapon © Jo J J bdob rn ae Le water 4obte A ql ey 1 poterbense trie jut fe-ce al LLL LINAS SL , / VA 4 7 / u > bea lock (20 points) 6. The map on the next page shows aquifer thikness (in meters) at several wells penetrating one aquifer. Construct a thickness (isopach) map for the aquifer using a contour interval of 50 meters, and starting with contour line 350 meters.