EECE 340 Problems Book, Spring 2020
American University of Beirut · Signals and Systems · 47 pages
Showing the first 10 of 47 pages. Download the PDF to see all of it.
More EECE 340 files
- Problems with Solutions · Spring 2011Problems · with solutionView
- Problems with Solutions · Spring 2011Problems · with solutionView
- Exam 2 · Spring 2017ExamView
- Exam 1 Kabalan · Spring 2017ExamView
- Exam 2 · Spring 2016ExamView
- Homework 1 Solution · Spring 2016Homework · with solutionView
- Homework 2 · Spring 2016HomeworkView
- Homework 2 Solution · Spring 2016Homework · with solutionView
Show the text of this problems
Chapter 7
Costs
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-2
Topics
1. The Nature of Costs.
2. Short-Run Costs.
3. Long-Run Costs.
4. Lower Costs in the Long Run.
5. Cost of Producing Multiple Goods.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-3
The Nature of Costs
• Economists measure all relevant costs.
– Explicit costs – direct, out-of-pocket payments for
inputs to its production process within a given time
period
– Implicit costs – reflect only a forgone opportunity
rather than an explicit, current expenditure.
• Accountants measure costs in ways that are
more consistent with tax laws and other laws.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-4
Opportunity Costs
• Economic cost or opportunity cost - the value
of the best alternative use of a resource.
• The economic or opportunity cost includes both
explicit and implicit costs.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-5
Solved Problem 7.1
• Meredith’s firm sends her to a conference for managers
and has paid her registration fee. Included in the
registration fee is free admission to a class on how to
price derivative securities such as options. She is
considering attending, but her most attractive
alternative opportunity is to attend a talk by Warren
Buffett about his investment strategies, which is
scheduled at the same time. Although she would be
willing to pay $100 to hear his talk, the cost of a ticket is
only $40. Given that there are no other costs involved in
attending either event, what is Meredith’s opportunity
cost of attending the derivatives talk?
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-6
Solved Problem 7.1: Answer
• To calculate her opportunity cost, determine the
benefit that Meredith would forgo by attending the
derivatives class.
• Because she incurs no additional fee to attend the
derivatives talk, Meredith’s opportunity cost is the
foregone benefit of hearing the Buffett speech.
Because she values hearing the Buffett speech at
$100, but only has to pay $40, her net benefit from
hearing that talk is $60 (= $100 – $40). Thus, her
opportunity cost of attending the derivatives talk is
$60.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-7
Costs of Durable Inputs
• Durable good – a product that is usable for
years.
• Two issues may arise in measuring the cost of
durable goods:
– How to allocate the initial purchase cost over time.
– What to do if the value of the capital changes over
time.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-8
Sunk Costs
• Sunk cost – a past expenditure that cannot be
recovered.
• Sunk cost is not relevant to a manager when
deciding how much to produce now.
• If an expenditure is sunk, it is not an
opportunity cost.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-9
Short-Run Costs
• Fixed cost (F) – a production expense that does
not vary with output.
• Variable cost (VC) – a production expense that
changes with the quantity of output produced.
• Cost (total cost, C) – the sum of a firm’s
variable cost and fixed cost:
C = VC + F
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-10
Marginal Cost
• Marginal cost (MC) – the amount by which a
firm’s cost changes if the firm produces one
more unit of output.
– And since only variable cost changes with output:
q
C
MC
q
VC
MC
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-11
Average Costs
• Average fixed cost (AFC) – the fixed cost
divided by the units of output produced:
AFC = F/q.
• Average variable cost (AVC) – the variable cost
divided by the units of output produced:
AVC = VC/q.
• Average cost (AC) – the total cost divided by the
units of output produced:
AC = C/q
AC = AFC + AVC.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-12
Table 7.1 Variation of Short-Run Cost
with Output
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-13
C
Figure 7.1 Short-Run
Cost Curves
120
216
400
48
0
6
10
10
4
2
8
Quantity, q, Units per day
Quantity, q, Units per day
6
A
4
2
8
F
1
27
1
20
VC
MC
AC
AVC
AFC
Cost, $
Cost per unit, $
(a)
(b)
60
28
27
20
8
0
B
b
a
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-14
10
Quantity, q, Units per day
6
4
2
8
AC
Cost per unit, $
60
28
27
20
8
0
When MC is
lower than
AVC, AVC is
decreasing…
and when MC is
larger than AVC,
AVC is increases
…so MC = AVC, at
the lowest point of
the AVC curve!
When MC is
lower than AC,
AC is
decreasing…
and when MC is
larger than AC,
AC is increases
…so MC = AC, at the
lowest point of the
AC curve!
AVC
MC
b
a
Relationship Between Average and
Marginal Cost Curves
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-15
Figure 7.2 Variable Cost and Total
Product of Labor
46
460
20
200
5
50
77
770
Total product,
Variable cost
0
5
1
10
13
L, Hours of labor per day
VC = wL, Variable cost, $
c
a
b
d
Quantity, q, Units per day
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-16
Shape of the Marginal Cost Curve
MC = DVC/Dq.
• But in the short run,
DVC = wDL
– Therefore,
MC = wDL/Dq
• The additional output created by every additional
unit of labor is:
Dq/ DL = MPL
– Therefore,
MC = w/ MPL
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-17
Shape of the Average Cost Curves
AVC = VC/q.
– But in the short-run, with only labor as an input:
AVC = VC/q = wL/q
– And since q/L = APL, then
AVC = VC/q = w/APL
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-18
Application: Short-Run Cost Curves
for a Beer Manufacturer
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-19
Effects of Taxes on Costs
• Taxes applied to a firm shift some or all of the
marginal and average cost curves.
• For example, suppose that the government
collects a specific tax of $10 per unit of output
from the firm.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-20
Figure 7.3 Effect of a Specific Tax on
Cost Curves
Costs per unit, $
15
5
8
10
0
q, Units per day
80
37
27
$10
$10
ACa = ACb + 10
ACb
MCb
MCa = MCb + 10
A $10.00 tax shifts
both the AC and
MC by exactly
$10…
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-21
Solved Problem 7.2
• What is the effect of a lump-sum franchise tax
on the quantity at which a firm’s after tax
average cost curve reaches its minimum?
(Assume that the firm’s before-tax average cost
curve is U-shaped.)
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-22
Solved Problem 7.2: Answer
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-23
Long-Run Costs
• Fixed costs are avoidable in the long run.
– In the long-run, F = 0.
– As a result, the long-run total cost equals:
C = VC
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-24
Isocost Line
• Isocost line - all the combinations of inputs
that require the same (iso-) total expenditure
(cost).
• The firm’s total cost equation is:
Labor
Costs
Capital
Costs
C = wL + rK.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-25
Isocost Line (cont.)
• The firm’s total cost equation is:
C = wL + rK.
– We get the Isocost equation by setting the costs at
a particular level:
C = wL + rK.
– And then solving for K (variable along y-axis):
K =
r
-
L
w
r
C
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-26
Table 7.2 Bundles of Labor and
Capital That Cost the Firm $200
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-27
Figure 7.4 A Family of Isocost Lines
K, Units of capital per year
a
d
e
$200 isocost
L, Units of labor per year
$200
$20
10 =
$200
$10 = 20
Isocost Equation
K =
r
-
L
w
r
C
Initial Values
C = $200
w = $10
r = $20
15
2.5
10
5
7.5
5
c
b
DL = 5
DK = 2.5
For each extra unit of
capital it uses, the
firm must use two
fewer units of labor
to hold its cost
constant.
Slope = -1/2 = w/r
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-28
Figure 7.4 A Family of Isocost Lines
(cont.)
K, Units of capital per year
a
e
$300 isocost
$200 isocost
L, Units of labor per year
$200
$20
15 =
$200
$20
10 =
$200
$10 = 20
$300
$10 = 30
Isocost Equation
K =
r
-
L
w
r
C
C = $300
w = $10
r = $20
An increase in C….
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-29
Figure 7.4 A Family of Isocost Lines
(cont.)
K, Units of capital per year
a
e
$300 isocost
$200 isocost
$100 isocost
L, Units of labor per year
$200
$20
15 =
$200
$20
10 =
$100
$20
5 =
$100
$10= 10
$200
$10 = 20
$300
$10 = 30
Isocost Equation
K =
r
-
L
w
r
C
C = $100
w = $10
r = $20
A decrease in C….
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-30
Combining Cost and Production
Information
• The firm can choose any of three equivalent
approaches to minimize its cost:
– Lowest-isocost rule - pick the bundle of inputs
where the lowest isocost line touches the isoquant.
– Tangency rule - pick the bundle of inputs where the
isoquant is tangent to the isocost line.
– Last-dollar rule - pick the bundle of inputs where
the last dollar spent on one input gives as much
extra output as the last dollar spent on any other
input.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-31
Figure 7.5 Cost Minimization
K, Units of capital per hour
50
0
L, Units of labor per hour
$3,000
isocost
$2,000
isocost
$1,000
isocost
Which of these three
Isocost would allow
the firm to produce
the 100 units of
output at the lowest
possible cost?
Isocost Equation
K =
r
-
L
w
r
C
Initial Values
q = 100
w = $24
r = $8
Isoquant Slope
MPL
MPK
= MRTS
-
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-32
Figure 7.5 Cost Minimization
K, Units of capital per hour
116
50
24
0
L, Units of labor per hour
100
303
28
q = 100 isoquant
$3,000
isocost
$2,000
isocost
$1,000
isocost
x
Isocost Equation
K =
r
-
L
w
r
C
Initial Values
q = 100
C = $2,000
w = $24
r = $8
Isoquant Slope
MPL
MPK
= MRTS
-
y
z
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-33
Cost Minimization
• At the point of tangency, the slope of the
isoquant equals the slope of the isocost.
Therefore,
r
MP
w
MP
r
w
MP
MP
MP
MP
MRTS
r
w
MRTS
K
L
K
L
K
L
last-dollar rule: cost is
minimized if inputs are
chosen so
that the last dollar spent
on labor adds as much
extra output as the last
dollar spent on capital.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-34
Figure 7.5 Cost
Minimization
K, Units of capital per hour
y
x
z
116
50
24
0
L, Units of labor per hour
100
303
28
q = 100 isoquant
$3,000
isocost
$2,000
isocost
$1,000
isocost
Spending one more dollar on
labor at x gets the firm as much
extra output as spending the
same amount on capital.
Initial Values
q = 100
C = $2,000
w = $24
r = $8
w
r
MPL
MPK
=
MPL = 0.6q/L
MPK = 0.4q/K
=
24
8
1.2
0.4
=
= 0.05
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-35
Figure 7.5 Cost
Minimization
K, Units of capital per hour
y
x
z
116
50
24
0
L, Units of labor per hour
100
303
28
q = 100 isoquant
$3,000
isocost
$2,000
isocost
$1,000
isocost
if the firm shifts one
dollar from capital to
labor, output falls by
0.017 because there is
less capital but also
increases by 0.1
because there is more
labor for a net gain of
0.083 more output at
the same cost….
So …the firm
should shift
even more
resources from
capital to labor—
which increases the
marginal product
of capital and
decreases the
marginal product
of labor.
Initial Values
q = 100
C = $2,000
w = $24
r = $8
w
r
MPL
MPK
MPL = 0.6q/L
MPK = 0.4q/K
= 24
8
2.5
0.13
=
= 0.1
= 0.017
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-36
Solved Problem 7.3
• Use the tangency rule to determine the cost-
minimizing bundles of labor and capital for a
general Cobb-Douglas production function, q
= ALαKβ, and for the specific beer production
function that underlies Figure 7.5, q =
1.516L0.6K0.4, where w = 24 and r = 8.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-37
Solved Problem 7.3: Answer
•
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-38
Figure 7.6 Change in Factor Price
K, Units of capital per hour
x
77
50
0
L, Workers per hour
100
52
q = 100 isoquant
Original
isocost,
$2,000
New isocost,
$1,032
v
w
r
MPL
MPK
=
Minimizing Cost Rule
A decrease in w….
Initial Values
q = 100
C = $2,000
w = $24
r = $8
w2 = $8
C2 = $1,032
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-41
The Long-Run Expansion Path and
the Long-Run Cost Function
• Expansion path - the cost-minimizing
combination of labor and capital for each
output level.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-42
Figure 7.7(a) Expansion Path and
Long-Run Cost Curve
K, Units of capital per hour
x
100
75
50
0
L,Workers per hour
150
200
100
Expansion path
$3,000
isocost
$2,000
isocost
$4,000
isocost
z
y
q = 100 Isoquant
q = 150 Isoquant
q = 200 Isoquant
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-43
Long-run cost curve
Figure 7.7(b) Expansion Path and
Long-Run Cost Curve
X
Y
Z
0
q , Units per hour
4,000
3,000
2,000
200
100
150
C, Cost, $
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-45
Figure 7.8 Long-
Run Cost Curves
• The shape of long run
cost curves is
determined by the
production function
relationship between
output and inputs.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-46
Economies of Scale
• Economies of scale - property of a cost
function whereby the average cost of
production falls as output expands.
• Diseconomies of scale - property of a cost
function whereby the average cost of
production rises when output increases.
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-47
Table 7.3 Returns to Scale and Long-
Run Costs
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-50
Figure 7.9 Long-Run Average Cost as the
Envelope of Short-Run Average Cost
Curves
Average cost, $
SRAC 1
SRAC 2
SRAC 3
SRAC 3
LRAC
q2
q1
q, Output per day
10
0
12
b
c
a
d
e
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-53
Figure 7.10 Long-Run and
Short-Run Expansion Paths
100
x
y
z
50
159
Long-run expansion path
200 isoquant
100 isoquant
Short-run
expansion path
$4,616
$4,000
$2,000
L, Workers per day
0
100
200
In the short run, the firm
cannot vary its capital, so
its short-run expansion
path is horizontal at the
fixed level of output.
In the long run, the beer
manufacturer increases its
output by using more of both
inputs, so its long-run
expansion path is upward
sloping.
K, Capital per day
Copyright ©2015 Pearson Education, Inc. All rights reserved.
7-57
Cost of Producing Multiple Goods
• Economies of scope - situation in which it is
less expensive to produce goods jointly than
separately.
• Production possibility frontier - the maximum
amount of outputs that can be produced from a
fixed amount of input.