CIVE 580 Midterm, Fall 2009
American University of Beirut · Construction Management · 17 pages · Dr. Mohamed-Asme Abdul Malak
Showing the first 10 of 17 pages. Download the PDF to see all of it.
More CIVE 580 files
Show the text of this exam
Case Study (Questions 1-4)
A Client developing a mixed-use project of 500 apartments, commercial space,
p
g
p
j
p
,
p
,
and underground parking is under a major constraint of starting construction on
the ground in a matter of a few weeks from the appointment of the A/E. Once
construction is started with excavation and shoring works, it is expected to
proceed directly with concrete works for the sub-structure and progressing
continuously with above-ground works, including concrete as well as other work
trades The Client has a project management (PM) firm acting on his behalf
trades. The Client has a project management (PM) firm acting on his behalf,
which has already helped him appoint a reputable consulting firm (A/E) to
provide design and construction supervision services. The Client has decided to
work with a prominent contracting company, familiar with the locality of the
project, to undertake all construction works. However, the Client does not
foresee going for a cost-plus-a-fee arrangement to engage this preferred general
foresee going for a cost plus a fee arrangement to engage this preferred general
contractor (GC). The PM and the A/E agreed to a methodology for delivering the
design in packages (not necessary along trades, but rather along sections of the
project), allowing construction to proceed as desired. It is also agreed that the
GC shall propose unit rates for negotiation with the PM and the A/E. These rates
will be offered against a hypothetical bill of quantities (BOQ) to be prepared by
g
yp
q
(
Q)
p
p
y
the A/E. Once the design is completed (while construction will still be underway),
a revised BOQ with more definite quantities will be generated and a more
definite overall contract price can be calculated for the Client to finalize his
project financing plans. Payments to the contractor will be made using the
agreed-upon unit rates and based on actual quantities of executed work as
measured on site
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
measured on site.
Construction Phasing
1
Th d
ib d
j
t d li
1.
The described project delivery
approach:
a) Can be viewed as one that involves
fast-tracking.
b) Is likely to result in considerable cut-
b) Is likely to result in considerable cut-
and-patch work.
c) Serves the principle of “enhancing
g
constructability” through engaging
the general contractor early on
during the design phase.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
during the design phase.
Construction Contract
2.
The type of adopted construction
contract:
a) Offers reasonably competitive prices for
construction works.
b) Can be best described as a negotiated
b) Can be best described as a negotiated
two-step re-measured contract.
c) Can be viewed as more advantageous to
th Cli
t
d t
ti
f
th
the Client as opposed to opting for the
cost-plus with a GMP type.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Measurement of Quantities
3.
It is correct to deduce that:
a) Extensive quantities take-off will be
done by the A/E prior to engaging the
done by the A/E prior to engaging the
GC.
b) Detailed quantities take-off will be made
b
h
/
l
h
d
by the A/E upon completing the design.
c) Periodical measurement of on-site
quantities will be made by each of the
q
y
PM and the GC during the construction
phase.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Project’s Achieved Quality
4.
It is expected that the level of quality
that may be achieved:
a) Is already being compromised on by having
selected a GC through no competition.
b) Is more or less being assured by having
)
g
y
g
appointed a reputable A/E firm based on the
advice of the PM.
c) Will depend on the effort invested and due
c) Will depend on the effort invested and due
diligence exercised by the on-site teams of
all three parties involved (GC, A/E, and PM).
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Technical Controller’s Role
5.
Complete the following sentence:
a)
The technical cont olle checks o
a)
The technical controller _checks or
reviews_ the work of the A/E, with
respects to design aspects,
p
o d
g
a p
,
including:
b)
_seismic resistance_ and
c)
_Fire fighting strategy_.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
The Defects Liability Period
6.
During the defects liability period:
a) The testing and commissioning of all
b ilding s stems
ill be pe fo med
building systems will be performed.
b) The general contract’s performance
guarantee shall remain valid
throughout.
c) The general contractor shall repair
latent defects and continue to adjust
latent defects and continue to adjust
and balance all functioning building
systems at his own expense.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
The Q&A Period
7.
This period:
a) represents an opportunity for the Client to
get formal feedback on the quality of design
get formal feedback on the quality of design
documents from qualified construction
professionals.
b) M
b d
i i t
d b th PM
ith
b) May be administered by the PM with
technical support provided by the A/E.
c) Does not offer any indication as to the
likelihood of facing claims during the
construction stage.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Unbalancing
8
Bid
b l
i
d
d i
l
8.
Bid unbalancing detected in a general
contractor’s lowest bid and deemed to be
aimed at “front-loading” the construction
g
contract:
a)
May have been the result of speculating on
quantity overrun for items of work falling in the
quantity overrun for items of work falling in the
earlier stages of the construction schedule.
b)
Represents sufficient ground to consider the
GC’s bid as non-responsive.
GC s bid as non responsive.
c)
Will automatically -and without further analysis-
result in the second lowest bidder being
selected.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
selected.
Sub-Contracts/Trade Contracts
9
I hifti
f
th GC (t
diti
l) t th
9.
In shifting from the GC (traditional) to the
phased project delivery approach, the
administrative burden of sub-contract
biddi
hift f
th GC t th f ll
i
bidding shifts from the GC to the following
participants according to the following order
(3-Highest burden to 1-least burden):
a)
The Architect/Engineer. 3
b)
The CM. 1
c)
The Owner. 2
[Distribute the ranks of “3”, “2”, and “1” on a), b),
and c) above]
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Project Participants
10
You are building a new hospital in
10.
You are building a new hospital in
Beirut Central District, close to the
Saifi Village. In addition to the owner,
g
,
designer, and contractor, list three
other possible major project
participants that are likely to be part
participants that are likely to be part
of the project organizational
structure:
a) _medical planner_.
b) _project manager__.
c)
technical controller
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
c) _technical controller___.
Project Contraints
11.
You are building a new hospital in
Beirut Central District, close to the
S ifi Vill
Li t th
i
t
t
Saifi Village. List three important
constraints, particular to this location,
which you believe can have an effect
which you believe can have an effect
on the construction process:
a) _site accessibility__.
b) _noise pollution__.
c) _SOLIDERE regulations____.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Bidding
Engineer’s Estimate
$, in million
LS
Avg Bid = 45
12.
Given the distribution above:
Min Bid = 38
Max Bid= 52
LS
price
a)
The successive bid spreads seem not to reveal any
major clustering.
b)
The difference between the highest and lowest bids
seem to indicate that the specifications may be
seem to indicate that the specifications may be
ambiguous.
c)
The client should probably consider that the bidding
results are inconclusive, particularly when the location
of the EE is taken into consideration
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
of the EE is taken into consideration.
Human Resources
13.
It is correct to say that:
a)
The fourth project parameter of safety is meant to
h
i
th
d t
f
i
t
emphasize the need to ensure a safe environment
for the construction workforce.
b)
The fourth project parameter of safety is meant to
h
i
th
d t
f
i
t
emphasize the need to ensure a safe environment
for the construction site and its immediate
surroundings.
)
The fo
th p oje t pa amete of safet is meant to
c)
The fourth project parameter of safety is meant to
emphasize the need to ensure a safe environment
for all groups involved in construction supervision.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Planning and Scheduling
14.
It is correct to say that:
a) Planning is a function exercised by the
GC with the aim of translating the
GC with the aim of translating the
design into a physical object.
b) Planning is a general term that could
f d ff
f
mean a range of different functions.
c) Scheduling has a lot to do with
calendar-based sequencing of
q
g
tasks/activities and a further analysis of
time-related calculations.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
Design-Build
15.
It is correct to say that under the DB
approach:
a) The Client is guaranteed the most
a) The Client is guaranteed the most
economical fixed price for the project.
b) The Client will want to do away with
h
i
t h
A/E
lt
t
d
having to have an A/E consultant and a
technical controller.
c) The A/E enjoys a relatively higher
)
j y
y
g
leverage compared to that enjoyed by
the A/E under the professional CM
approach.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT
pp
Construction Financing
16.
Construction financing is concerned with:
a)
Ensuring that enough money is secured by the
t
t
t k
th
t
ti
h
l
contractor to keep the construction wheel
rolling.
b)
Making sure that the appropriate financial
i
t
t (
h
l tt
f
dit
LC )
instruments (such as letter of credits - LCs) are
in place to allow the procurement of construction
materials.
)
Making s
e that bidde s a e paid fo the
c)
Making sure that bidders are paid for the
administrative costs incurred in preparing their
construction bid prices.
CIVE 580 & ENMG 502
CONSTRUCTION MANAGEMENT